OpenBCM V1.13 (Linux)

Packet Radio Mailbox

DB0FHN

[JN59NK Nuernberg]

 Login: GUEST





  
W8ISS  > SAT      04.07.05 20:16l 251 Lines 7091 Bytes #999 (0) @ AMSAT
BID : ANS-185.S4
Read: GUEST
Subj: WSR 185 Part 4 07/03/2005
Path: DB0FHN<DB0MRW<OK0PPL<DB0RES<DK0WUE<7M3TJZ<JM1YSB<HS1LMV<CX2SA
Sent: 050704/1858Z @:CX2SA.LAV.URY.SA #:6378 [Minas] FBB7.00e $:ANS-185.S4
From: W8ISS@CX2SA.LAV.URY.SA
To  : SAT@AMSAT


AMSAT NEWS SERVICE BULLETIN 185.S4 FROM AMSAT HQ
SILVER SPRING, MD, JULY 03,2005
TO ALL RADIO AMATEURS
BID: $ANS-185.S4

THE FOLLOWING SATELLITES ARE NOT IN ORBIT BUT ARE
PROPOSED FOR LAUNCH AT THIS TIME:

UCISAT ?O-??
Catalog number:
Proposed Launch Date:  October 31, 2005

Status: Under Construction

Downlink: Submission in Progress
Uplink:   Submission in Progress
Callsign: Submission in Progress

This from Matt Bennett, KF6RTB, UCISAT Communications Team Member:

Our website is www.ucisat.net .This is a new website, however, and doesn't
have the "Status" section active yet. Because of the growing interest in our
project, I'll push our webmaster to create updates (hopefully) on a week-to-
week basis. For now, the current status of the mission is as follows:

-Expected Launch Date: October 31st, 2005
-Frequency Allocation: Submission in Progress
-Construction Status: Sub-Assembly
[WSR to thank Matt Bennett, KF6RTB, for this week's report.]
[01302005]
=====
SSETI ?O-??
Catalog Number:
Proposed Launch Date: Early 2005

Status: Under Construction

>From Graham, G3VZV:
All work on the  SSETI Express spacecraft has now been completed and the
spacecraft has left its "birthplace" - a cleanroom at the ESA ESTEC facility
in the Netherlands. The spacecraft has been packed into its special transport
container and is en-route to the launch site at Plesetsk in Northern Russia.

The launch date is still listed as 25th August (current approx lift off is
06:50UTC but this may be corrected later) and arrangements are underway for
the launch to be shown live on ASTRA-1G - a Ku band satellite covering most
of Europe and, hopefully, these transmissions will also be streamed at both
high and low resolution on the internet.

Full details of all these media resources will be made known as soon as they
are finalised as will details of the telemetry downloading and decoding
software and the prizes being offered by ESA for the largest and also the
first contributor!

AMSAT-UK will have a team member at the launch site during the launch
campaign and intend to provide regular updates during the lead up to August
25th.

You can find more info about SSETI at:
http://sseti.gte.tuwien.ac.at/WSW4/

[ANS thanks Graham, G3VZV for the above information]

Looking at the website for the SSETI Express webcam
http://sseti.gte.tuwien.ac.at/WSW4/webcam.htm

[07032005]
=====
PCSAT2 ?0-??
Catalog Number:
Proposed Launch Date: May 2005

PCSAT2, which had previously been stowed in the Space Shuttle Discovery,
arrived at Launch Complex 39B on 07 April 2005.  PCSAT2 is now standing
by ready to be launched on the first Space Shuttle return-to-flight
mission.

PCSAT2 will use the same dual redundant AX.25 command and control system
as used on PCsat (NO-44) offering 8 on/off commands, 5 telemetry
channels and a serial port for the solar cell experiment telemetry. It
also supports the Digital Comms Relay support of the PCsat/APRS mission.
The packet uplink is on 145.825 MHz and the default downlinks are in the
435 MHz band to avoid any possible interference with existing ARISS
missions. PCSAT2 will have quad redundant transmit inhibits for EVA
safety issues, thus, it is also easy to turn off to avoid any issues
with other UHF ARISS experiments that may be activated in the future.
Also, the mission lifetime of PCSAT2 is only 1 year, because it is a
sample-return mission, thus terminating any long term conflicts in
spectrum management.

The PCSAT2 mission is intended as an opportunity to augment existing
ARISS communications experiments with an external autonomous
communications payload. In this regard, it has several potential uses:

*  A UI-Digipeater to help ease congestion on the currently shared
   ARISS PMS (Packet Mail system)

*  A PSK-31 transponder for multi-user communications to improve
   accessibility for schools and ARISS outreach programs.

*  An FM Voice repeater for full duplex crew communications to
   facilitate crew-to-school ARISS contacts.

*  Routine Telemetry on the spacecraft systems

For more information and pictures visit the PCSAT2 website at
http://www.ew.usna.edu/~bruninga/pcsat2.html

[ANS thanks Bob, WB4APR for the above information]
[04102005}
=====
PHASE 3E ?O-??
Catalog Number:
Proposed Launch Date: Early 2006

Status: Under Construction

The AMSAT-Phase 3E satellite (P3E) is dedicated as communication and
scientific platform for a highly elliptical orbit around Earth. The
spacecraft will be created in a joint process together with the P5A
Mars mission by an international team under leadership of AMSAT-DL
and continues the successful series of AMSAT-Phase 3 satellites.
Additionally the spacecraft will be a test bench for technology
developped for the Mars mission. The main task of P3E is to act as
communication platform for radio amateurs worldwide. A launch is
planned in the period 2004 to 2006.

For the latest project status update please visit the AMSAT-DL
P3-E web page:
http://www.amsat-dl.org/p3e/
[03272005]
=====
CP1 ?o-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: N6CP
Proposed Transmit Frequency: 436.845
[03272005]
=====
CP2 ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: TBA
Proposed Transmit Frequency: 437.325
[03272005]
=====
HAUSAT1 ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: D90HP
Proposed Transmit Frequency: 437.465
[03272005]
=====
ICE Cube 1 ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: W2CXM
Proposed Transmit Frequency: 437.305
[03272005]
=====
ICE Cube 2 ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: N2VR
Proposed Transmit Frequency: 437.425
[03272005]
=====
ION ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: TBA
Proposed Transmit Frequency: 437.505
[03272005]
=====
KUTEsat ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: KC0RMW
Proposed Transmit Frequency: 437.385
[03272005]
=====
MEROPE ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: K7MSU-1
Proposed Transmit Frequency: 145.980
[03272005]
=====
nCUBE1 ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: TBA
Proposed Transmit Frequency: 437.305
			    2407.25
[03272005]
=====
RINCON ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: WA4CEW
Proposed Transmit Frequency: 436.870
			     437.345
[03272005]
=====
SACRED ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: WA4CEW
Proposed Transmit Frequency: 436.870
[03272005]
=====
SACRED ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: WA4CEW
Proposed Transmit Frequency: 436.870
[03272005]
=====
SEEDS ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: JQ1YGU
Proposed Transmit Frequency: 437.485
[03272005]
=====
Mea Huaka ?O-??
Catalog Number:
Proposed Launch Date: Mid May 2005

Proposed Callsign: TBA
Proposed Transmit Frequency: 437.405
[03272005]
NNNN


Read previous mail | Read next mail


 17.11.2026 00:29:19lGo back Go up